Horizontal Directional Drilling (HDD) is a highly efficient and trenchless installation method for the underground placement of HDPE ducts and Emtelle’s FibreFlow microduct bundles.
FibreFlow DBR (Direct Buried Reinforced) microduct bundles with double sheath and ca. 30% higher tensile load compared to standard microduct sheath.
Our tube bundles are tight protected microducts suitable for installation of fibre units containing between 1 to 24 fibres, as well as 24-144 fibres in Minicables.
Documentation
SELECT DOCUMENTS |
HDD Brochure |
---|
Got any questions? Speak to our solutions expert
Contact usDave Rames
Technical Field Support Engineer
Subscribe to our Newsletter